A Chronology of Development on the Osage River and Tributaries

• 1813 – The Osages and Chouteaus reluctantly agreed to locate the trading post on the Missouri River instead of on the Osage, near their home, acknowledging that the Osage was too shallow for year round transportation.
• 1821 – Harmony Mission attempted a water mill on the Marais des Cygnes (then called the Osage River) but it washed out.
• 19th century – numerous pioneer mills on tributaries throughout the 1800s
• Circa 1840s – Caplinger Mills – successful grist mill on the Sac River. In 1917 this became the first hydroelectric project on the Osage system
• 1895 – Lock & Dam No. 1 construction started because of agitation for river improvement for steamboats. Designed by Hiram Chittenden, built by Army Corps of Engineers.
• 1906 Bates County Ditch, an ill-conceived channelization of the Marais des Cygnes
• Late 1920s – run-of-the-river hydroelectric dam at Osceola built by Ozark Utility Company
• 1931 Bagnell Dam closed. Financed by Union Electric of St. Louis, but started by Walter Cravens and Ralph Street of Kansas City.
• 1932 – Corps of Engineers delivers 308 Report on “Osage River, Mo. And Kans.”

Corps of Engineers Dams completed 1961-1982

• 1961 – POMME DE TERRE, on the Pomme de Terre River – multipurpose pool of 7,820 acres
• 1963 – POMONA, KANSAS, on Dragoon and One Hundred Ten Mile creeks – 4,060 acres
• 1969 – STOCKTON DAM, MISSOURI, on Sac River – 24,900 acres. Stockton is larger than the first two projects and is the only one, besides Truman, to have hydropower generation
• 1975 – MELVERN LAKE, KANSAS, on the Marais des Cygnes – 6,930 acres
• 1979 – TRUMAN DAM, WARSAW MISSOURI on the Osage River – 55,600 acre power pool
• 1982 – HILLSDALE, KANSAS, on Big Bull Creek – 4,580 acres

• ? – Removal of Lock & Dam No. 1. Originally unjustified and an environmental disaster today

More information is available in DAMMING THE OSAGE: The Conflicted Story of Lake of the Ozarks and Truman Reservoir. Retail $35, it is available from our website for $25 postage paid.

www.dammingtheosage.com
www.beautifulozarks.com
http://www.youtube.com/user/lensandpenpress
Search Lens and Pen Press on Facebook
https://twitter.com/LensandPenPress

May 092013
 

Schematic LnDNo.1

Local plans for improvements to the Osage River to make it a commercially navigable stream projected a series of locks and dams.  Work by the Corps of Engineers on the first one began in September 1895 at Shipley Shoals, then seven miles from the mouth of the Osage. A key feature of the project was the “Chittenden Drum Wicket”  (or the Chanoine wicket), the half-round section shown in this diagram. Designed by Army Corps Captain Hiram Martin Chittenden to regulate the flow of the river, the retractable 375-foot long iron mechanism was installed on top of a 9-foot concrete dam.  It was prone to being jammed by mud and clogged by drift and was eventually scrapped.

Soon after its completion in 1906 a 30-foot section of the dam collapsed.  That was rebuilt and for more than a century the lone lock and dam has served more as an impediment to river travel than as an improvement.

Capt. Chittenden redeemed himself with the Chittenden locks in Seattle, a complex of locks at the west end of Salmon Bay, part of Seattle‘s Lake Washington Ship Canal.  Chittenden became the Seattle District Engineer for the Corps soon after completion of Lock and Dam No. 1. Seattle’s locks include working fish ladders for salmon. They were formally opened in 1917 and are still in operation. Chittenden retired as a general.

Possibly he erred in his calculations for Lock and Dam No.1 because he was absorbed in the writing of multi-volume books on the fur trade in the West and on steamboating on the Missouri River. Remarkably, unlike other histories written in that era, these are still in print, and even available in e-book format. His guidebook to Yellowstone is also still in print.

Today there is growing interest in getting rid of Lock & Dam No.1. The sad, crumbling state of the structure was painfully exposed during the drought of 2012.  We have added a section to the Web site pulling together information on the current controversy surrounding Lock and Dam No. 1

http://www.dammingtheosage.com/lock-and-dam-no-1-on-the-osage-river/

Continue reading »

Oct 242012
 

Real photo postcard, circa 1910

Handwritten’ labels’ on the card beside each fish identify  three blue catfish and two American eels, the largest of which is 27 pounds. At the end of the card is written: “These are fish from the Osage River. Look kinda small here but were larger.”

Today, only eel of course are found in the 85-plus miles of free flowing river below Bagnell Dam. Lock and Dam #1 probably blocks most of their upriver journey, except in high water.


Continue reading »

Aug 262012
 

20120825-214727.jpg

This summer’s drought has drastically lowered water levels on major waterways throughout the Midwest. The Corps of Engineers first major water control project on the Osage – built around the turn of the last century to facilitate steamboat travel – Lock and Dam #1 was if anything an impediment to river commerce. This morning the crumbling hulk lay exposed to sun and camera…. A reminder that water resource projects have a finite usefulness and then become relics and dangerous ruins.